RFQ and Drawing Checklist
33 items. A drawing that carries them gets quoted in a day, with a narrow number. One that does not gets four rounds of questions, or a price with padding in it to cover what the shop had to assume.
Last checked September 27, 2026. Works whoever you send the drawing to, including shops we have nothing to do with.
Files
A STEP file carries the geometry. A PDF drawing carries the intent. A shop with only one of them is guessing at the other.
The part itself
What it is and what it bolts to. Naming the interface standard saves a round of questions on its own.
Tolerances
Three to six dimensions genuinely matter. A default of plus or minus 0.02 mm on everything asks the shop to hold every dimension, and you pay for all of them.
Finish
The most common source of argument on a machined and anodized part is whether dimensions apply before or after coating.
Quantity and timing
A shop quoting 25 pieces that it knows becomes 250 in spring treats the fixture as an investment rather than a cost to recover immediately.
Quality and paperwork
These cannot be added to a batch after it is made. Ask up front or do without.
Commercial
Cheap to agree now, expensive to argue about later.
What this buys you
Not politeness. A complete RFQ changes the number at the bottom of the quote, because every assumption a shop has to make gets priced with a margin on top of it.
- Narrower quotesShops stop padding for the tolerance they cannot see and the finish they had to guess.
- Comparable quotesThree shops quoting the same part rather than three interpretations of it.
- A drawing that survivesComplete enough that a second shop makes the same part. If it is not, you were relying on the first shop's memory.